Early days
01- 09-2009. Project X has safely been installed upside down upon 4 axle stands, (cheers Rob), within my garage. The majority of loose and peeling paint has been scrapped off to accelerate the drying process. The plan is to allow the hull time to dry, without heat, for several weeks to avoid warping. Oh and allow me time to complete point scoring household jobs so that I may become a hermit later in the year. Some areas of rot and damage can now be seen to be more severe than originally thought whilst other areas are in better shape than was first thought. At this point in time there is nothing apparently so severe that cannot be overcome, happy days.
No comments:
Post a Comment